FC Köln, RheinEnergieStadion

8th April 2014

In 2014, Zelte Frank was tasked by its long-time partner, the German football club 1. FC Köln, with the realization of a number of tent constructions. The first of these was at an event on the hallowed pitch of the RheinEnergieStadion in Cologne. In order to prevent any damage to the pitch, floor systems were selected, which only required a minimum area for underpinning. Additionally, Zelte Frank’s own mobile crane was utilised in order to limit the travel paths of the assembly personnel to the minimum required amount. A special construction “lean-to roof” with a side height of 5.60 metres was used. As a result, the guests were able to enjoy all-round visibility into the lit stadium. The assembly time was 24 hours, disassembly was completed in 10 hours.